Completed steel structure project by Laotie Steel - industrial building construction
Back to Home

Featured Projects

Delivered steel structures to 30+ countries across 5 continents. Each project — engineered to local codes, fabricated to international standards.

30+
Countries
200+
Projects Completed
100,000+
Tons Fabricated
15+
Years Experience
Industrial Warehouse Complex (120×60m)
2025Portal Frame Steel Building

Industrial Warehouse Complex (120×60m)

A large-span portal frame warehouse for an Australian logistics company, designed to AS/NZS 1170 wind load requirements. Single-span 60m clear interior with 12m eave height, accommodating high-bay racking systems and 20T overhead crane operations.

Sydney, Australia
7,200 sqm
Portal Frame Steel Building

Project Highlights

Cyclonic wind region design (Region C)
Full hot-dip galvanized structure for coastal environment
120 km/h wind rating with full engineering certification
Integrated mezzanine office space — 600 sqm
Factory Complex — Phase II Expansion
2024Multi-Span Steel Structure

Factory Complex — Phase II Expansion

Phase II expansion of a manufacturing plant in Lagos Free Trade Zone. Three continuous spans of 30m each, creating a column-free production floor totaling 15,000 sqm. Designed for high humidity tropical environment with enhanced corrosion protection.

Lagos, Nigeria
15,000 sqm
Multi-Span Steel Structure

Project Highlights

Tropical climate corrosion package — SA 2.5 + 320μm DFT epoxy system
30m × 3 continuous spans, column-free interior
Integrated natural ventilation ridge vents — 120 units
Completed 6 weeks ahead of schedule
Shopping Mall Dome Roof
2024Space Frame Structure

Shopping Mall Dome Roof

A curved bolt-ball space frame roof for a 4-story shopping mall atrium in Metro Manila. The 80m × 40m oval dome features a central skylight and integrated MEP service walkways. All bolted connections — zero site welding required, enabling rapid assembly during the Philippine dry season.

Manila, Philippines
3,200 sqm
Space Frame Structure

Project Highlights

80m oval span, bolt-ball system — no site welding
Central skylight with integrated drainage channels
Seismic design per NSCP 2015 (Philippine Building Code)
PVDF coated for tropical UV resistance — 15-year warranty
Logistics Distribution Center
2023Steel Building + Mezzanine

Logistics Distribution Center

A massive logistics hub in Dubai South (DWC) Free Zone, combining warehouse and office functions under one roof. The structure features 50m clear-span bays, 18m eave height, loading docks on both longitudinal sides, and a 3,000 sqm integrated office mezzanine with fire-rated construction.

Dubai, UAE
22,000 sqm
Steel Building + Mezzanine

Project Highlights

Fire-rated 2-hour protection on mezzanine structural members
50T overhead crane runway beams — 4 bays
Designed for 50°C ambient temperature per UAE Building Code
HVAC-ready roof structure with equipment support platforms
Agricultural Processing Plant
2025Portal Frame + Crane System

Agricultural Processing Plant

A food-grade processing facility for grain handling and packaging in Western Australia. The structure integrates 15T overhead cranes with food-safe epoxy-coated steel members, positive-pressure ventilation, and dust extraction systems. All steelwork designed to AS/NZS 5131 for fabrication and erection.

Perth, Australia
5,600 sqm
Portal Frame + Crane System

Project Highlights

Food-grade epoxy internal coating on all structural steel
AS/NZS 5131 compliant fabrication and erection
Integrated 15T crane system with full engineering certification
Dust extraction and positive-pressure ventilation ready
Aircraft Maintenance Hangar
2023Large-Span Space Frame

Aircraft Maintenance Hangar

A maintenance hangar for narrow-body aircraft (Boeing 737 / Airbus A320 class) at an Indonesian regional airport. The 80m × 60m clear-span space frame roof provides unobstructed interior space for aircraft tail clearance. Designed to Indonesian SNI 1727 loading standards with tropical cyclone considerations.

Jakarta, Indonesia
4,800 sqm
Large-Span Space Frame

Project Highlights

80m clear span — no interior columns for full aircraft access
Designed to SNI 1727:2020 (Indonesian Building Code)
Integrated fire suppression system supports in roof structure
4 × 25T overhead crane runways for engine maintenance

Have a Similar Project?

Share your requirements and drawings — our engineering team will provide a detailed quotation with structural calculations within 24 hours.

Start Your Project →

Laotie Steel

Online · Typically replies in 2 hours

👋 Hi there! How can we help with your steel structure project?

Just now

or type a message