
Steel Structure Building
Portal Frame / Industrial Warehouse
Custom-designed steel portal frame buildings for factories, warehouses, workshops, and logistics centers. Section steel main frame, Z/C purlins, bracing system. Design in accordance with AS/NZS, BS, and Chinese GB standards.
Product Overview
Our steel structure buildings are the backbone of modern industrial construction. Using portal frame or truss systems, we deliver clear-span spaces up to 60m without internal columns — maximizing usable floor area for manufacturing, storage, and logistics operations.
Each building is engineered to your local design codes (AS/NZS 1170, BS 5950, EN 1993, or GB 50017) and comes with full calculation reports, fabrication drawings, and erection manuals. Our 5 production lines output 5,000 tons per month, ensuring on-time delivery for projects of any scale.
A typical 3,000 sqm warehouse structure ships from our factory in 25–35 working days. We provide optional on-site supervision and can recommend local erection contractors through our network. Every bolt, plate, and member is labeled and match-marked for rapid assembly — crews typically erect 500–800 sqm per day with a 5-person team.
Technical Specifications
| Main Frame | Q355B/Q235B H-section steel, hot-dip galvanized option |
| Purlin | C/Z cold-formed galvanized steel, 1.5-3.0mm thickness |
| Bracing | Round steel bar / angle steel cross bracing |
| Clear Span | Up to 60m (single span), unlimited multi-span |
| Eave Height | 4m – 25m |
| Crane Capacity | Up to 50T overhead crane compatible |
| Design Standards | AS/NZS 1170, BS 5950, EN 1993, GB 50017 |
| Surface Treatment | Shot blasting SA 2.5 + alkyd / epoxy / HDG |
| Roof Slope | 5% – 15% (standard), up to 30% for architectural |
Key Features
Applications
Related Articles
Learn more about steel structure building applications
Steel Structure Production in China: Complete Manufacturing Guide 2026
Learn how Chinese steel structure manufacturers produce high-quality steel buildings at competitive prices. Discover the production process, quality standards, and why China leads global steel structure manufacturing.
Steel Structure Installation Guide: Step-by-Step Erection Process
Complete guide to steel structure installation. Learn the erection process, safety requirements, equipment needed, and timeline for steel building installation in 2026.
Factory Tour: How We Produce 5,000 Tons of Steel Structures Monthly
Take a virtual tour of Laotie's steel structure factory — 5 production lines, a 5-step manufacturing process, and quality control at every stage.
Ready to Start Your Project?
Send us your project requirements and drawings. Our engineering team will provide a detailed quotation with structural calculations within 24 hours.


