
Steel Structure Building
Portal Frame / Industrial Warehouse
Custom steel portal frame buildings for factories, warehouses & logistics. Z/C purlins, AS/NZS, BS & GB standards. CE certified.
Product Overview
Our steel structure buildings are the backbone of modern industrial construction. Using portal frame or truss systems, we deliver clear-span spaces up to 60m without internal columns — maximizing usable floor area for manufacturing, storage, and logistics operations.
Each building is engineered to your local design codes (AS/NZS 1170, BS 5950, EN 1993, or GB 50017) and comes with full calculation reports, fabrication drawings, and erection manuals. Our 5 production lines output 5,000 tons per month, ensuring on-time delivery for projects of any scale.
A typical 3,000 sqm warehouse structure ships from our factory with a lead time of 15–30 days depending on project size. We provide optional on-site supervision and can recommend local erection contractors through our network. Every bolt, plate, and member is labeled and match-marked for rapid assembly — crews typically erect 500–800 sqm per day with a 5-person team.
Before you request a quotation, try a free check of FOB steel weight from length, width and height to see the steel weight we would normally quote against.
Technical Specifications
| Main Frame | Q355B/Q235B H-section steel, hot-dip galvanized option |
| Purlin | C/Z cold-formed galvanized steel, 1.5-3.0mm thickness |
| Bracing | Round steel bar / angle steel cross bracing |
| Clear Span | Up to 60m (single span), unlimited multi-span |
| Eave Height | 4m – 25m |
| Crane Capacity | Up to 50T overhead crane compatible |
| Design Standards | AS/NZS 1170, BS 5950, EN 1993, GB 50017 |
| Surface Treatment | Shot blasting SA 2.5 + alkyd / epoxy / HDG |
| Roof Slope | 5% – 15% (standard), up to 30% for architectural |
Key Features
Applications
Typical Delivery Timeline
From design approval to site delivery
Engineering Design
Calculation reports, shop drawings, erection manual
1–2 weeksFabrication
CNC cutting, welding, shot blasting, coating
4–6 weeksShipping
Container loading, ocean freight to your port
2–4 weeksSite Erection
Bolt-together assembly with remote guidance
4–8 weeksProduction lead time: 15–30 days depending on project size; shipping and installation time vary by destination and site. Rush production available.
Why Choose Laotie Steel?
A team with 15+ years of export experience, trusted by buyers in 30+ countries
CE (EN 1090), TÜV & ISO 9001
Every product is CE (EN 1090), TÜV and ISO 9001 certified. Mill test certificates (MTC) are provided with every shipment.
5,000 Tons Monthly Capacity
Factory with 5 production lines, about 5,000 t/month. Whether you need a 500 m² workshop or a 50,000 m² industrial complex, we deliver on time.
30+ Countries Served
Export experience across Southeast Asia, Middle East, Africa, Australia, and South America. We design to your local building code: AS/NZS, BS 5950, EN 1993, AISC, or GB 50017.
Full Engineering Package
Structural calculation reports, detailed shop drawings, and erection manuals included with every order. Our engineers use Tekla, SAP2000, and STAAD.Pro for precision design.
Factory-Direct Pricing
No middleman markup. You buy directly from the manufacturer. Typical savings of 30–50% compared to local fabrication, even after shipping and duties.
Team with 15+ Years of Export Experience
Based in Shangqiu, Henan — China's steel manufacturing hub. Projects in 30+ countries. Every bolt, plate, and member is labeled and match-marked for rapid assembly.
Frequently Asked Questions
Common questions about steel structure building
How much does a steel structure building cost?
Steel structure building costs range from $25 to $110 per square meter depending on size, design complexity, and local code requirements.
How long does it take to build a steel structure?
Factory production lead time is 15–30 days depending on project size, from design approval and deposit to shipment. On-site erection takes 4–8 weeks depending on building size and is separate from factory lead time. Sea freight depends on the destination port.
What certifications do you have?
Our factory is CE (EN 1090), TÜV and ISO 9001 certified. Welding procedures follow AWS D1.1 / EN 1090-2. Mill test certificates (MTC) are provided for raw steel.
Can you design to my local building code?
Yes. We design to IBC, Eurocode, AS/NZS, and most national building codes. Full structural calculations included.
Do you provide installation overseas?
We provide erection manuals, remote video guidance, and can dispatch supervisors for on-site installation support.
Related Articles
Learn more about steel structure building applications
Steel Structure Production in China: A Manufacturing Guide
How Chinese manufacturers produce quality steel buildings at competitive prices. Production process, quality standards, and why China leads steel structure
Steel Structure Installation: Step-by-Step Erection Guide
Complete guide to steel structure installation. Learn the erection process, safety requirements, equipment needed, and timeline for steel building
Factory Tour: 5,000 Tons of Steel Structures Monthly
Take a virtual tour of Laotie's steel structure factory — 5 production lines, a 5-step manufacturing process, and quality control at every stage.
Ready to Start Your Project?
Send us your project requirements and drawings. Our engineering team will provide a detailed quotation with structural calculations within 24 hours.



