Steel Truss Deck
All Products

Steel Truss Deck

Rebar Truss Composite Decking

Rebar truss deck with an integrated welded steel truss — no bottom reinforcement to fix on site. Spans to 5m unpropped. Z275 base sheet, TD1–TD5 models.

Price range:$12–$22/m²FOB China
In production — 30-day lead time

Product Overview

Steel truss deck (rebar truss deck, 钢筋桁架楼承板) is a thin galvanized base sheet with a factory-welded triangular steel truss running along every rib. The truss is designed as the bottom reinforcement of the finished slab, so instead of tying a mesh layer on site, the crew simply lays the panels, adds top mesh and pours.

This removes the single most labour-intensive step of a conventional composite floor. Site labour drops sharply, the construction sequence shortens, and the reinforcement position is fixed by the panel geometry — not by how carefully a worker tied chairs on a windy deck.

Panels are roll-formed and truss-welded from G550 galvanized coil with a Z275 coating, then cut to length per bay. Five standard truss heights cover slabs from 100 mm to 220 mm, with unpropped spans reaching 5.0 m — enough to clear most structural grids without temporary propping.

Steel truss deck costs more per square meter than a plain open composite profile, but on fast-track or labour-constrained projects the saving in site labour and programme time usually outweighs the material premium. Both systems are produced in our factory and can be combined on one project.

Technical Specifications

ModelsTD1-70, TD2-90, TD3-100, TD4-120, TD5-150
Base SheetG550 galvanized steel, Z275 coating
Base Sheet Thickness0.4mm – 0.8mm (BMT)
Truss Height70mm – 150mm
Slab Thickness100mm – 220mm
Max Unpropped Spanup to 5.0m
Truss WeldingAutomatic resistance welding, factory-controlled
Design StandardsAS/NZS 2327, BS 5950-4, EN 1994-1-1, JGJ 400
Sheet LengthCut-to-length, up to 13.5m per sheet

Steel Truss Deck Models (TD Series)

ModelTruss HeightBase Sheet ThicknessSlab ThicknessMax Unpropped Span
TD1-7070 mm0.4 – 0.6 mm100 – 120 mm2.4 – 3.0 m
TD2-9090 mm0.4 – 0.6 mm120 – 140 mm3.0 – 3.6 m
TD3-100100 mm0.5 – 0.7 mm130 – 160 mm3.2 – 4.0 m
TD4-120120 mm0.5 – 0.8 mm150 – 180 mm3.6 – 4.5 m
TD5-150150 mm0.6 – 0.8 mm180 – 220 mm4.0 – 5.0 m

TD models are designated by truss height. The welded truss replaces the bottom reinforcement layer of a conventional composite slab — top mesh and negative-moment bars over supports are still required.

Truss Deck vs Open Composite Deck — Selection Guide

CriterionSteel Truss DeckOpen Composite Deck
Bottom reinforcementBuilt into the welded trussMesh layer fixed on site
Max unpropped span3.0 – 5.0 m2.0 – 4.0 m
Site labourLowest — lay and pourHigher — mesh tying required
Unit material costHigher per m²Lower per m²
ProgrammeFastest floor cycleStandard floor cycle
Best forFast-track, labour-constrained projectsCost-driven projects with available labour

Selection should be based on total installed cost — including site labour and programme — not material price alone.

Key Features

Integrated Bottom Reinforcement — welded truss replaces site-tied mesh
Fewest Site Operations — lay panels, add top mesh, pour
Long Unpropped Spans — up to 5.0m without temporary props
Consistent Cover — rebar position fixed by panel geometry, not site workmanship
Faster Programme — shorter floor cycles on multi-storey frames
Factory Welded — resistance-welded truss with controlled weld quality

Applications

Multi-storey residential and commercial towers
Fast-track projects with limited site labour
Buildings where propping is impractical (over roads, plant, water)
Industrial floors and heavy-duty mezzanines
Bridges and infrastructure deck slabs

Typical Delivery Timeline

From design approval to site delivery

Engineering Design

Calculation reports, shop drawings, erection manual

1–2 weeks

Fabrication

CNC cutting, welding, shot blasting, coating

4–6 weeks

Shipping

Container loading, ocean freight to your port

2–4 weeks

Site Erection

Bolt-together assembly with remote guidance

4–8 weeks

Production lead time: 15–30 days depending on project size; shipping and installation time vary by destination and site. Rush production available.

Why Choose Laotie Steel?

A team with 15+ years of export experience, trusted by buyers in 30+ countries

CE (EN 1090), TÜV & ISO 9001

Every product is CE (EN 1090), TÜV and ISO 9001 certified. Mill test certificates (MTC) are provided with every shipment.

5,000 Tons Monthly Capacity

Factory with 5 production lines, about 5,000 t/month. Whether you need a 500 m² workshop or a 50,000 m² industrial complex, we deliver on time.

30+ Countries Served

Export experience across Southeast Asia, Middle East, Africa, Australia, and South America. We design to your local building code: AS/NZS, BS 5950, EN 1993, AISC, or GB 50017.

Full Engineering Package

Structural calculation reports, detailed shop drawings, and erection manuals included with every order. Our engineers use Tekla, SAP2000, and STAAD.Pro for precision design.

Factory-Direct Pricing

No middleman markup. You buy directly from the manufacturer. Typical savings of 30–50% compared to local fabrication, even after shipping and duties.

Team with 15+ Years of Export Experience

Based in Shangqiu, Henan — China's steel manufacturing hub. Projects in 30+ countries. Every bolt, plate, and member is labeled and match-marked for rapid assembly.

Steel Deck Systems We Manufacture

All four deck systems below are roll-formed in our own factory, so a project can mix systems and ship everything in one container.

Frequently Asked Questions

Common questions about steel truss deck

What is steel truss deck?

Steel truss deck is a galvanized profiled base sheet with a factory-welded triangular steel truss along each rib. The truss acts as the bottom reinforcement of the composite slab, so no mesh layer has to be tied on site.

Do I still need rebar with truss deck?

You no longer need a bottom reinforcement layer — that is built into the truss. Top mesh and negative-moment reinforcement over supports are still required, and are normally supplied and cut to length with the order.

What is the maximum span?

Up to 5.0 m unpropped with the TD5-150 model. Shorter truss heights suit shorter spans — for example TD1-70 covers 2.4 to 3.0 m. Final spans depend on slab thickness, imposed load and concrete grade.

Is truss deck more expensive than open deck?

The material cost per square meter is higher, but the installed cost is often lower on fast-track projects because the bottom reinforcement comes pre-fixed and the floor cycle is shorter. We quote both systems for comparison on request.

What standards does it comply with?

Truss deck is designed to AS/NZS 2327, BS 5950-4, EN 1994-1-1 and Chinese standard JGJ 400, with factory-controlled resistance welding of the truss to the base sheet.

Ready to Start Your Project?

Send us your project requirements and drawings. Our engineering team will provide a detailed quotation with structural calculations within 24 hours.