Skip to main content
Steel structure case study projects
Back to Home

Steel Structure Case Studies

Real projects, real results. See how Laotie Steel solved complex engineering challenges for clients across 30+ countries.

30+
Countries Served
200+
Projects Completed
100,000+
Tons Fabricated
45 Days
Fastest Delivery
Industrial Warehouse case study - Sydney, Australia
2025Industrial Warehouse

Sydney Logistics Co.

Sydney, Australia
7,200 sqm
Industrial Warehouse

Challenge

Need for a 60m clear-span warehouse in Sydney's Wind Region B (cyclonic zone). Required 20T overhead crane and high-bay racking system.

Solution

Designed portal frame using AS 4100 with tapered H-sections. 385 tons Q355B steel. Colorbondยฎ cladding with anticon blanket.

Result

Completed in 25 working days. 55m/s wind rating. 600 sqm mezzanine office included.

View Full Case Study โ†’
Factory Complex case study - Lagos, Nigeria
2024Factory Complex

Lagos Manufacturing Ltd.

Lagos, Nigeria
15,000 sqm
Factory Complex

Challenge

Phase II expansion of a manufacturing plant requiring three 30m continuous spans with enhanced corrosion protection for tropical climate.

Solution

Multi-span portal frame with SA 2.5 + 320ฮผm DFT epoxy coating system. Natural ventilation ridge vents.

Result

Completed 6 weeks ahead of schedule. Column-free production floor of 15,000 sqm.

View Full Case Study โ†’
Space Frame Dome Roof case study - Manila, Philippines
2024Space Frame Dome Roof

Metro Manila Mall Developer

Manila, Philippines
3,200 sqm
Space Frame Dome Roof

Challenge

80m oval dome roof for a 4-story shopping mall atrium. Zero site welding allowed. Seismic zone design.

Solution

Bolt-ball space frame system with PVDF coated members. Central skylight with integrated drainage.

Result

All bolted connections โ€” rapid dry-season assembly. 15-year coating warranty.

View Full Case Study โ†’
Logistics Distribution Center case study - Dubai, UAE
2023Logistics Distribution Center

Dubai South Logistics

Dubai, UAE
22,000 sqm
Logistics Distribution Center

Challenge

Massive logistics hub requiring 50m clear-span bays, 18m eave height, 50T crane, and fire-rated construction.

Solution

Steel building with 2-hour fire-rated mezzanine. 50T overhead crane runway beams in 4 bays.

Result

Designed for 50ยฐC ambient temperature per UAE code. 3,000 sqm integrated office.

View Full Case Study โ†’
Agricultural Processing Plant case study - Perth, Australia
2025Agricultural Processing Plant

Perth Grain Processors

Perth, Australia
5,600 sqm
Agricultural Processing Plant

Challenge

Food-grade facility requiring epoxy-coated steel, 15T cranes, dust extraction, and AS/NZS 5131 compliance.

Solution

Portal frame with food-safe epoxy internal coating. Integrated 15T crane system. Positive-pressure ventilation.

Result

AS/NZS 5131 compliant fabrication. Dust extraction ready. Food-safe environment.

View Full Case Study โ†’
Aircraft Maintenance Hangar case study - Jakarta, Indonesia
2023Aircraft Maintenance Hangar

Jakarta Regional Airport

Jakarta, Indonesia
4,800 sqm
Aircraft Maintenance Hangar

Challenge

80m clear-span hangar for Boeing 737/A320 aircraft. Required 4 ร— 25T cranes and fire suppression.

Solution

Large-span space frame roof. SNI 1727:2020 compliant design. Integrated fire suppression supports.

Result

Column-free interior for full aircraft access. 4 ร— 25T crane runways for engine maintenance.

View Full Case Study โ†’
Sports Equipment Factory case study - Shangqiu, China
2025Sports Equipment Factory

Hongxin Sports Co.

Shangqiu, China
12,800 sqm
Sports Equipment Factory

Challenge

160m ร— 80m column-free production area for annual output of 8 million trampolines.

Solution

Portal frame with 10T overhead crane running full 160m length. PIR sandwich panels.

Result

Completed in 45 days from contract signing. 100mm PIR walls, 75mm rock wool roof.

View Full Case Study โ†’

Start Your Project

Share your requirements โ€” our engineering team will provide a detailed quotation with structural calculations within 24 hours.

Get a Free Quote โ†’