
Galvanized C & Z Purlin
Cold-Formed Steel Purlins & Girts
Hot-dip galvanized C purlin and Z purlin for steel structure roofs and walls. C80-C300, Z100-Z350. Pre-punched, pre-cut to length. CE certified, mill direct.
Product Overview
C and Z purlins are the backbone of steel building roof and wall systems. Our cold-formed galvanized purlins are roll-formed from high-strength structural steel with hot-dip galvanized coating (Z275 minimum) for long-term corrosion resistance โ ideal for industrial, commercial, and agricultural steel buildings.
C purlins are typically used for simple-span applications where lapping is not required, while Z purlins feature sleeved or overlapped connections for continuous-span design โ reducing material weight and cost. Both profiles are available with pre-punched holes for swift bolted installation.
All purlins are manufactured to precise tolerances on automated roll-forming lines. Custom lengths, punching patterns, and notch details can be programmed for your specific project. Standard lead time: 15-20 working days from order.
Technical Specifications
| Profile Types | C Purlin (C80-C300), Z Purlin (Z100-Z350) |
| Steel Grade | Q235B, Q355B, G450, G550 (per AS/NZS 4600) |
| Coating | Hot-dip galvanized Z275 (275g/mยฒ), Z350 available |
| Thickness | 1.5mm โ 3.0mm (16ga โ 10ga) |
| Length | Custom cut to project requirements (max 12m single piece) |
| Holes | Pre-punched bolt holes per project drawings |
| Splice Option | Z purlin: sleeved connection for continuous span |
| Standard | GB/T 6725, EN 10162, AS/NZS 4600 |
| Packing | Bundled with steel strapping, FCL/LCL ready |
Key Features
Applications
Related Products

Steel Structure Building
Portal Frame / Industrial Warehouse

Floor Deck / Steel Decking
Composite & Galvanized Floor System

Space Frame / Roof Truss
Large-Span Structure

Enclosure / Cladding System
Wall & Roof Panel Solution

Steel Warehouse Building
Portal Frame / Clear Span

Steel Factory Building
Multi-Span / Industrial Production Facility

Steel Workshop Building
Light Industrial / Maintenance Facility

Hot Rolled Steel Coil & Sheet
Steel Coil / Plate / Cut-to-Length / Slit Coil

Prefab House & Container House
Temporary / Permanent Modular Building Solution

PPGI / Color Coated Steel Sheet
Pre-Painted Galvanized / Galvalume Steel Coil

FRP Skylight / Translucent Roofing Sheet
Fiberglass Reinforced Plastic Daylight Panel

Insulated Sandwich Panel System
Rock Wool / PUR / PIR / EPS Fire-Rated Panel
Frequently Asked Questions
Common questions about galvanized c & z purlin
What is the difference between C and Z purlin?
C purlins are used for simple spans where lapping isn't needed. Z purlins have sleeved connections for continuous span design, reducing material weight.
What zinc coating is standard?
Z275 (275g/m2) hot-dip galvanized is standard. Z350 available for coastal environments.
Can you pre-punch holes?
Yes. Holes are punched per your project drawings โ no site drilling needed.
What steel grades are used?
Q235B, Q355B, G450, G550 depending on span and loading requirements.
How long does production take?
Standard lead time: 15-20 working days for custom orders.
Related Articles
Learn more about galvanized c & z purlin applications
Steel Structure Warehouse Design: Clear Span, Crane Systems & Layout Planning
Expert guide to steel structure warehouse design. Learn about clear span configurations, crane systems, mezzanine floors, eave height, column spacing, and layout optimization for storage and operations.
Steel Structure Installation: Step-by-Step Erection Guide
Complete guide to steel structure installation. Learn the erection process, safety requirements, equipment needed, and timeline for steel building installation in 2026.
Prefabricated Steel Building: Complete Guide to Prefab Warehouses & Factories
Complete guide to prefabricated steel buildings. Learn about PEB design, manufacturing process, cost savings, delivery times, and how to choose the right prefab steel building for your project.
Ready to Start Your Project?
Send us your project requirements and drawings. Our engineering team will provide a detailed quotation with structural calculations within 24 hours.